
Selecting the right shoring props has a direct impact on site safety, work efficiency, and construction timelines.
This media platform introduces shoring products with specifications tailored to different construction types and applications.
It features key product details, manufacturer characteristics, and real-world case studies.
Source: https://www.forbuild.co.jp/material/alpa.php
| Unit Weight |
8.9/11.1 kg |
|---|---|
| Load Capacity |
19.0~36.0 kN* |
| Material | Aluminum |
| Max Length |
3,490mm |
*When the upper end is fixed to timber and the lower end to concrete
*Based on the Alpa 45 model.
Source: https://www.peri.ltd.uk/products/peri-up-flex-heavy-duty-prop-hd.html
| Unit Weight |
91.03~265.98kg |
|---|---|
| Load Capacity |
Up to 200 kN |
| Material | Steel |
| Max Length |
Approx.8,330mm |
https://www.peri.ltd.uk/dam/jcr:cb5a5bf0-8e05-4d70-b6fd-780f3cf91333/peri-up-flex-hd-prop.pdf
Source: https://www.altrad-coffrage.com/en/solutions/shoring/props/tetrashor.html
| Unit Weight |
Approx. 131–159 kg |
|---|---|
| Load Capacity |
Up to 400 kN* |
| Material | Hot-Dip Galvanized High-Tensile Steel |
| Max Length |
17,000mm* |
*Applicable to single-leg prop configuration onl
We introduce recommended shoring prop products along with their key features and real-world case studies. If you'd like to learn more about suitable applications or the support we offer after implementation, be sure to take a look.

Source: Forbuild Official Website
https://www.forbuild.co.jp/en/material/alpa.php
Lightweight and High-Strength—Reducing On-Site Workload.
Easy to Carry and Install by Hand
The Alpa prop weighs just 8.9 kg, yet offers a load capacity of 19 kN. Made of aluminum with a corrosion-resistant surface finish, it is built for durability and long-term use.
Its lightweight design makes manual transport and setup quick and efficient on short-duration projects, helping reduce the number of delivery trips and the manpower required.
Ideal for sites where installation and dismantling are repeated daily, the Alpa streamlines workflow, reduces overtime, and minimizes the need for extra crew or idle time.
User-Friendly Insertion Pipe Design Reduces Risk
of Accidents and Wear
Featuring an easy-to-handle insertion pipe system,
this aluminum prop is lightweight and highly corrosion-resistant—making it ideal for coastal or humid environments without compromising performance.
It resists dents and seizing even after repeated setup and removal, helping reduce repair and disposal costs. With minimal need for anti-rust treatment during storage and simple wipe-down cleaning, maintenance is also simplified.
This reduces the need for backup stock or emergency replacements, contributing to shorter downtime and improved profit margins.
| Unit Weight | 8.9/11.1 kg |
|---|---|
| Load Capacity | 19.0~36.0 kN* |
| Material | Aluminum |
| Max Length | 3,490mm |
*When the upper end is fixed to timber and the lower end to concrete

Traditional steel props are heavy and difficult to handle, often considered the least favored equipment by formwork carpenters. During transport, the inner tube must be tilted to prevent it from slipping and falling, which adds extra handling time and risk.
With the introduction of the lightweight yet high-strength Alpa prop, transporting and installing props on site has become significantly easier, leading to major improvements in work efficiency. Its insertion pipe design allows it to stand on its own, and its corrosion-resistant aluminum body makes it both durable and easy to handle.
As construction sites face an aging workforce, the Alpa prop has proven effective in reducing the physical burden on skilled laborers.
| Company Name | Forbuild Co., Ltd. |
|---|---|
| Head Office Address | 3-14-28 Nakamiya, Asahi-ku, Osaka-shi, Osaka, Japan |
| Official Website | https://www.forbuild.co.jp/ |

Source:PERI Official Website
https://www.peri.ltd.uk/products/peri-up-flex-heavy-duty-prop-hd.html
Real-Time Deflection Adjustment Without Interrupting Work
Thanks to its hydraulic cylinder mechanism, the prop allows for height and reaction force adjustments even under load, ensuring stable performance during use. In applications like seismic retrofitting or staged demolition, it enables quick correction of clearances and deflection without halting work—preventing structural interference and overloading.
It also allows for immediate fine-tuning when replacing bearings or correcting elevation gaps based on measurements, minimizing schedule delays and avoiding the need to reinstall temporary supports.
Balancing Safety with Reduced Expansion and Protection Costs
Pre-applied prestress supports the self-weight of beams and slabs, along with live loads, helping to prevent sudden drops or falling components during dismantling. This minimizes the risk of damage to scaffolding, piping, and equipment, as well as preventing potential injuries.
Even during transitional phases of seismic reinforcement work, the system maintains level positioning and deflection control, reducing the need for additional temporary supports. As a result, traffic restrictions and protection zones around the site can be minimized—leading to fewer labor hours and lower overall costs.
| Unit Weight | 91.03~265.98kg |
|---|---|
| Load Capacity | Up to 200 kN |
| Material | Steel |
| Max Length | Approx.8,330mm |
*https://www.peri.ltd.uk/dam/jcr:cb5a5bf0-8e05-4d70-b6fd-780f3cf91333/peri-up-flex-hd-prop.pdf

At a site with a 30-meter diameter shaft and a height of 15 meters, the concrete needed to be poured in multiple stages. This required a shoring system capable of supporting and adjusting under load while enabling safe lowering during the process.
The Flex Heavy-Duty Prop HD allows for controlled displacement and lowering even under heavy loads, ensuring safe and reliable support and release during staged construction. This improved manageability throughout the process.
Additionally, the hydraulic unit can be relocated between props, reducing the number of cylinders required and contributing to better cost efficiency for materials and equipment.
Source: https://www.peri.ltd.uk/projects/thames-tideway-kirtling-street.html
| Company Name | PERI SE(PERI Group) |
|---|---|
| Head Office Address | P.O. Box 1264, 89259 Weissenhorn, Germany |
| Official Website | https://www.peri.com/ |

Source: Altrad Official Website
https://www.altrad-coffrage.com/en/solutions/shoring/props/tetrashor.html
Exceptional Durability That Keeps Construction on Track
The use of high-strength steel with a galvanized finish enhances corrosion resistance, making the system highly durable even in harsh conditions such as rain, snow, and salt exposure.
It withstands long-term outdoor installation without significant deterioration, reducing the need for weatherproofing and ongoing maintenance, and helping to prevent delays in the construction schedule.
Fewer repainting and replacement cycles, along with reduced inspection frequency, allow for higher equipment uptime and contribute to lower material costs.
Lateral Stability That Maintains Structural Precision
Its integrated modular design offers superior resistance to lateral forces, effectively preventing shifting and tilting caused by wind loads or minor vibrations.
This helps reduce the risk of unexpected accidents and workplace injuries.
Even during typhoons or earthquakes, the system maintains structural tolerances.
By minimizing the need for reinstallation, reinforcement, routine inspections, and temporary fencing repairs, it also supports long-term construction planning by ensuring site safety and reducing complaints from nearby properties.
| Unit Weight | Approx. 131–159 kg |
|---|---|
| Load Capacity | Up to 400 kN* |
| Material | "Hot-Dip Galvanized High-Tensile Steel |
| Max Length | 17,000mm* |
*For single-post applications only

Tetrashor was adopted for civil engineering work at a station site. The project spanned 14 months and required parallel progress on both the station and tunnel sections, posing significant challenges—including restricted site access, long-term load management, and safe assembly and dismantling in uneven or crane-inaccessible areas.
A total of 11 tons of Tetrashor were supplied to the site. While tunnel excavation work continued below, parallel construction was enabled above using temporary support with 10-meter spans over a 45-meter station section. This setup ensured long-term stability and safe working conditions, even during concurrent operations.
| Company Name | Altrad RMD Kwikform |
|---|---|
| Head Office Address | Foundation House, Brickyard Road, Aldridge, Walsall, WS9 8BW |
| Official Website | https://www.rmdkwikform.com/hk/ |
Source: Forbuild Official Website https://www.forbuild.co.jp/material/alpa.php
Lightweight aluminum props that reduce damage in the event of drops or collisions, keeping repair costs low. Excellent corrosion resistance ensures long-term reusability, reducing material waste and enabling high turnover.
| Manufacturer |
|---|
| Forbuild |
| Headquarters |
| 3-14-28 Nakamiya, Asahi-ku, Osaka-shi, Osaka, Japan |
| Website |
| https://www.forbuild.co.jp/ |
Source: Altrad RMD KwikformOfficial Website https://www.rmdkwikform.com/bh/products/rapidshor/
Made from high-strength steel with galvanized key components for enhanced durability. Designed to withstand long-term outdoor exposure while resisting lateral displacement caused by wind or ground movement.
| Manufacturer |
|---|
| Altrad RMD Kwikform |
| Headquarters |
| Foundation House, Brickyard Road, Aldridge, Walsall, WS9 8BW, UK |
| Website |
| https://www.rmdkwikform.com/hk/ |
Source: AcrowOfficial Website https://acrow.co/products-and-systems/acrow-prop-table-form-system
Slab shoring system supporting heights up to approx. 4.5 meters. The telescopic steel design allows fast on-site adjustment. Table-type structure covers large areas efficiently and is suitable for various applications.
| Manufacturer |
|---|
| Acrow Misr for Metallic Scaffolding and Formwork |
| Headquarters |
| Wady Houf, Helwan, Cairo, Egypt |
| Website |
| https://acrow.co/homepage |
Source: PERIOfficial Website
https://www.peri.com.kw/products/multiprop-aluminium-slab-props.htm
Lightweight yet high-load aluminum props. Can be used independently or with frames. Easier to handle than steel, enabling smooth height adjustment and assembly.
| Manufacturer |
|---|
| PERI SE |
| Headquarters |
| P.O. Box 1264, 89259 Weissenhorn, Germany |
| Website |
| https://www.peri.com/ |
Source: DokaOfficial Website
https://shop.doka.com/shop/de/en/components-%26-accessories/floor-props/floor-prop-eurex-100-plus/eurex-100-plus/p/028/
Aluminum slab props supporting up to 128 kN, weighing only about 29 kg even in the longest model—ideal for overhead work. Quick-screw mechanism and self-cleaning threads prevent jamming and clogging.
| Manufacturer |
|---|
| PERI SE |
| Headquarters |
| P.O. Box 1264, 89259 Weissenhorn, Germany |
| Website |
| https://www.peri.com/ |
Source: ULMAOfficial Website https://www.ulmaconstruction.com/en/formwork/props-shoring-systems/heavy-duty-shoring/heavy-duty-shoring-towers-mk
Designed for heavy-duty applications like bridgeworks and large-scale structures. MK-150 suits low shoring, while MK Props are ideal for confined support. Minimal components enable quick assembly and dismantling. Optional handrails and stairs available.
| Manufacturer |
|---|
| ULMA C y E, S. Coop. |
| Headquarters |
| Ps. Otadui, 3 - Apdo. 13, 20560 OÑATI (Gipuzkoa), Spain |
| Website |
| https://www.ulmaconstruction.com/en |
Source: ISCHEBECK TITANOfficial Website https://www.ischebeck.de/en/productgroup/titan-props/
Versatile props suited for slab shoring, temporary floor reinforcement, and PC deck support. Available in four sizes (2 / 3 / 4 / 7 meters), with a focus on flexibility and on-site adaptability.
| Manufacturer |
|---|
| ISCHEBECK TITAN |
| Headquarters |
| Loher Straße 31–79, 58256 Ennepetal, Germany |
| Website |
| https://www.ischebeck.de |
Source: MGF Trench ConstructionOfficial Website https://mgf.co.uk/products/unishore-light/
Ideal for renovation sites, upper floors, and tight areas requiring manual transport. Compact sections (15.2 kg/m, 220×170 mm) reduce handling effort and lower the risk of drops or site accidents.
| Manufacturer |
|---|
| M.G.F. (Trench Construction Systems) Limited |
| Headquarters |
| Grant House, South Lancashire Ind. Est., Lockett Road, Ashton-in-Makerfield, Wigan, WN4 8DE, UK |
| Website |
| https://mgf.co.uk/ |
Source: LayherOfficial Website https://layherna.com/scaffold-towers
Heavy-duty towers for bridge erection and plant construction. Modular design supports high loads through clustering (4-leg configuration) and optional spindle reinforcements. Compatible with handrails and stair systems.
| Manufacturer |
|---|
| Wilhelm Layher GmbH & Co. KG |
| Headquarters |
| Ochsenbacher Strasse 56, 74363 Güglingen-Eibensbach, Germany |
| Website |
| https://www.layher.com/de-de |
Source: MEVAOfficial Website https://meva.net/en-gb/products/mt-60/
Versatile props suited for slab shoring, temporary floor reinforcement, and PC deck support. Available in four sizes (2 / 3 / 4 / 7 meters), with a focus on flexibility and on-site adaptability.
| Manufacturer |
|---|
| ISCHEBECK TITAN |
| Headquarters |
| Loher Straße 31–79, 58256 Ennepetal, Germany |
| Website |
| https://www.ischebeck.de |
With expertise built through years of experience in design, installation, and maintenance, Meadows Engineering offers tailored shoring solutions that meet specific site conditions.
Their Acrow Props and Beam Lifters are available for next-day delivery, with rental options by day, week, or month—helping boost jobsite productivity.
| Headquarters |
|---|
| Unit 31A, Sefton Lane Industrial Estate, Maghull, Liverpool, L31 8BX |
| Website |
| https://www.meadowsengineering.co.uk |
Mabey Hire operates a nationwide distribution network across the UK, supplying equipment quickly from the nearest depot.
They offer end-to-end support—from temporary works design to supply, installation, and dismantling—helping shorten project timelines. High-risk projects are backed by a 24-hour emergency response line.
| Headquarters |
|---|
| Scout Hill, Ravensthorpe, Dewsbury, West Yorkshire, WF13 3EJ, UK |
| Website |
| https://www.mabeyhire.co.uk |
With online ordering, HSS enables same-day in-store pickup or next-day delivery.
They offer quick responses to sudden design changes or reinforcement needs, and corporate clients can use the HSS ProService platform for streamlined ordering and invoicing.
| Headquarters |
|---|
| Building 2, Think Park, Mosley Road, Trafford Park, Manchester, M17 1FQ, UK |
| Website |
| https://www.hss.com |
With multiple depots across key regions, Site Equipment provides rapid nationwide delivery.
They support urgent reinforcement needs and reduce on-site burden by offering technical support for temporary works planning, including documentation for regulatory approval.
| Headquarters |
|---|
| St Andrews Road, Avonmouth, Bristol, BS11 9HS |
| Website |
| https://www.siteequipment.co.uk |
Operating over 2,000 locations nationwide (as of October 2025), Mammoth Hire ensures quick delivery from the nearest branch.
Corporate clients can open a 30-day trade account, easing the administrative burden of rental cost processing.
| Headquarters |
|---|
| Dovecot Court, Stanley Grange Business Park, Ormskirk Road, Prescot, Liverpool L34 4AR |
| Website |
| https://www.mammoth-hire.co.uk |
With numerous branches across the UK, Jewson offers quick arrangement of rental equipment.
After an online inquiry, same-day pickup or next-day delivery is possible, and a dedicated specialist team manages nationwide rentals through a centralized system.
| Headquarters |
|---|
| Merchant House, Binley Business Park, Harry Weston Road, Coventry, CV3 2TT, UK |
| Website |
| https://www.jewson.co.uk |
As a formwork specialist based in the UK, Formwork Direct provides fast delivery and collection services nationwide.
All rental props are regularly inspected and maintained by qualified technicians to ensure compliance with safety regulations
| Headquarters |
|---|
| Formwork House, 1 Hornhouse Lane, Knowsley, England, L33 7YQ |
| Website |
| https://formworkdirect.co.uk |

In residential construction on narrow sites where short schedules are critical, key challenges include securing structural loads, reducing
labor for material handling, and ensuring proper noise protection.
This case study explains pre-installation issues and how they were resolved

Renovation projects often involve nighttime work while facilities remain in operation, limited ceiling clearance, and dust control requirements.
This case study highlights safety load planning and schedule optimization solutions.

Tunnel excavation requires long-span support and precise settlement/deflection management during parallel operations.
This case study clearly explains how fine adjustments under load were implemented.

Bridge repair demands safe management of unbalanced loads and wind loads.
This case study covers the procedures for safe load transfer and support switching in detail.

In disaster recovery efforts, rapid support is essential—even in unstable ground conditions, aftershocks, or material shortages.
This case study explores real examples of safe and effective shoring under such constraints.

In high-rise slab construction, managing material transport at height, reducing manpower, and controlling deflection are critical.
This case study shows how shoring systems enabled safe and efficient operations.