
| Commercial | ✓ |
|---|---|
| DIY | - |
| Sales | ✓ |
| Hire | ✓ |
We introduce falsework props and systems by Acrow Misr (Acrow Group), based in Egypt. From lightweight systems designed for slab construction to heavy-duty solutions suitable for bridge and tunneling construction, this overview summarizes the configurations and key features tailored to different applications.

The ACROW Prop Table Form System is a falsework prop for slab construction, suitable for heights of up to around 4.5 meters. It is composed of telescopic steel pipes, allowing the height to be easily adjusted to suit on-site conditions.
Its table-type configuration makes it well suited to large-area slab construction, while assembly, striking, and relocation can be carried out smoothly and efficiently. The system is also designed with reusability and ease of storage in mind, making it a practical choice for sites where efficient transportation and space management are important.
| Weight | Upon request |
|---|---|
| Load-Bearing Capacity | 20 kN / 30 kN |
| Material | • Material: Steel • Surface treatment: Hot-dip galvanizing |
| Overall Length | • Table Dimensions Length: 4.00 m / 5.00 m Width: 2.15 m, 2.5 m, 2.65 m, 2.9 m Applicable slab height: Up to a maximum of 4.5 m |

Acrow Heavy Duty Shoring is a falsework system used for the construction of heavy-load structures such as bridges and tunnels. By combining ringlock components and soldier members, the system provides stable support even under high load conditions.
The height and configuration can be adjusted to suit site-specific requirements, and pre-assembly prior to delivery helps improve installation efficiency. The system is also suitable for re-shoring and repair works, and its robust design allows it to withstand long-term use on demanding projects.
| Weight | Upon request |
|---|---|
| Load-Bearing Capacity | • Ring Lock: Up to 260 kN/post • Acrow Soldier: Up to 350 kN/post |
| Material | Upon request |
| Overall Length | • Standard soldier: 4.50 m • Upper H-jack and Lower H-jack: 50 to 70 cm |

At the large-scale transportation infrastructure project “Sports City Interchange” in Amman, Jordan, Acrow’s falsework systems were used during construction.
This project was carried out as part of an intersection improvement plan associated with the development of a BRT (Bus Rapid Transit) system.
For the construction of bridge sections and elevated structures, Acrow’s falsework solutions—combined with formwork and reinforcement systems—were employed to achieve both high accuracy and efficient on-site operations.
| Commercial | ✓ |
|---|---|
| DIY | - |
| Sales | ✓ |
| Hire | ✓ |
Acrow is primarily positioned for commercial construction projects, contractors, and project teams that require engineered formwork and scaffolding support. Its services include engineering solutions, formwork sales, formwork rental, site support, after-sales service, and logistics, making it a strong fit for companies that need more than product supply alone.
Acrow supports contractors with project analysis, formwork planning, and customized system proposals. Its technical team can help select the right systems, prepare assembly drawings and calculation sheets, and provide supporting documents such as manuals, on-site guides, and tutorial materials. This support is especially useful for contractors that need to align temporary works with structural requirements, approval processes, and site workflows.
Acrow supports both product sales and rental. For sales, the company provides commercial bids that include proposed systems, consumable-item calculations, and alternative solution options. For rental projects, Acrow offers standard formwork and scaffolding systems through its rental yards and logistics facilities, helping contractors manage project budgets, delivery schedules, storage space, and equipment reuse.
Acrow also provides site training, resident engineer or supervisor support, pre-assembly, inspection, and certification services. These services help crews assemble and use the systems properly while confirming that the formwork has been installed in line with project requirements before loading or concrete placement. After-sales support is also available for maintenance, overhaul, and cleaning.
Acrow’s published service information does not indicate a dedicated DIY or individual-consumer service, such as single-prop rental, small private-home delivery, or simplified DIY safety guidance. For that reason, for users who are planning small-scale DIY work, Acrow is more like a commercial and contractor-oriented provider rather than a typical retail DIY supplier.
Although Acrow lists residential and commercial projects among its business segments, its published service details focus on project-based engineering, sales, rental, logistics, site support, and professional construction workflows. Local builders and private customers should contact Acrow directly to confirm whether their location, project size, and required quantity are eligible for support.
| Company Name | Acrow Misr for Metallic Scaffolding and Formwork |
|---|---|
| Headquarters Address | Wady Houf, Helwan, Cairo, Egypt |
| Official Website | https://acrow.co/homepage |
Headquartered in Egypt, Acrow Misr leverages its strategic location to serve key markets across the globe. With a proven track record of sustainable growth, the company continues to expand its international footprint through a robust network of branches and subsidiaries.
Core Regions: Extensive operations across the MENA region, Africa, and South-Eastern Europe.
Key Markets: Established branches in the UAE, Saudi Arabia (KSA), Qatar, Oman, Kuwait, Bahrain, Morocco, Algeria, Nigeria, Kenya, Tanzania, and Romania.
Strategic Growth: Ongoing expansion into new markets and product lines, including Acrow Misr Building Products (ABP) for specialized construction materials.
Source: https://www.forbuild.co.jp/material/alpa.php
| Unit Weight |
8.9/11.1 kg |
|---|---|
| Load Capacity |
19.0~36.0 kN* |
| Material | Aluminum |
| Max Length |
3,490mm |
*When the upper end is fixed to timber and the lower end to concrete
*Based on the ARPA 45 model.
Source: https://www.peri.ltd.uk/products/peri-up-flex-heavy-duty-prop-hd.html
| Unit Weight |
91.03~265.98kg |
|---|---|
| Load Capacity |
Up to 200 kN |
| Material | Steel |
| Max Length |
Approx.8,330mm |
https://www.peri.ltd.uk/dam/jcr:cb5a5bf0-8e05-4d70-b6fd-780f3cf91333/peri-up-flex-hd-prop.pdf
Source: https://www.altrad-coffrage.com/en/solutions/shoring/props/tetrashor.html
| Unit Weight |
Approx. 131–159 kg |
|---|---|
| Load Capacity |
Up to 400 kN* |
| Material | Hot-Dip Galvanized High-Tensile Steel |
| Max Length |
17,000mm* |
*Applicable to single-leg prop configuration onl